← Back to Hammersmith & Fulham

Status

Pending Consideration Change of use
Received n/a
New dwellings 0

What you can do

Take Action

Make your voice heard. Authorities need to hear from people who support new homes.

Summary

Alterations to retail unit: new shopfront, rooflights, sedum roof, rear balcony, and basement excavation for habitable room.

Full Proposal

Alterations to the roof of existing single storey ground floor front extension (retail unit) to include, installation of a new rooflight, reinstatement of an existing rooflight, installation of sedum roof, and installation of an air conditioning unit; installation of a new shopfront and a new residential entrance door with a fanlight above, to replace existing; installation of French doors with window panels and formation of a balcony to replace the existing window, to the rear elevation at ground floor level; excavation of part of the existing front basement including installation of a walk on rooflight above, to increase head height and use as a habitable room.

Detail pages

Documents

010-A-10-09 C
Revised Drawing
Not downloaded · Council link
010-A-10-10 C
Revised Drawing
Not downloaded · Council link
010-A-10-11 REV D
Revised Drawing
Not downloaded · Council link
010-A-16-01 REV D
Revised Drawing
Not downloaded · Council link
010-A-16-01-A1 -A
Revised Drawing
Not downloaded · Council link
ACKNOWLEDGEMENT VALID APPLICATION
Correspondence
Not downloaded · Council link
ACKNOWLEDGEMENT VALID APPLICATION
Correspondence
Not downloaded · Council link
APPLICATION FORM_REDACTED
Application Form
Not downloaded · Council link
CIL FORM COMPLETED
BackGround Papers
Not downloaded · Council link
CONSTRUCTION METHOD STATEMENT
Report
Not downloaded · Council link
DESIGN & ACCESS STATEMENT
Report
Not downloaded · Council link
EXISTING BASEMENT PLAN
Drawing
Not downloaded · Council link
EXISTING FIRST FLOOR PLAN
Drawing
Not downloaded · Council link
EXISTING FRONT ELEVATION
Drawing
Not downloaded · Council link
EXISTING GROUND FLOOR PLAN
Drawing
Not downloaded · Council link
EXISTING SECTION & ELEVATION BB
Drawing
Not downloaded · Council link
EXISTING SECTION AA
Drawing
Not downloaded · Council link
EXISTING SITE BLOCK PLAN
Drawing
Not downloaded · Council link
EXISTING SITE LOCATION PLAN
Drawing
Archived copy · Council link
FLOOD RISK ASSESSMENT
Report
Not downloaded · Council link
INVALID LETTER PLANNING APPLICATIONS
Correspondence
Not downloaded · Council link
INVALID LETTER PLANNING APPLICATIONS
Correspondence
Not downloaded · Council link
INVALID LETTER PLANNING APPLICATIONS
Correspondence
Not downloaded · Council link
LOCATION PLAN
Drawing
Not downloaded · Council link
PROPOSED BASEMENT PLAN
Drawing
Not downloaded · Council link
PROPOSED FIRST FLOOR PLAN
Drawing
Not downloaded · Council link
PROPOSED FRONT ELEVATION
Drawing
Not downloaded · Council link
PROPOSED GROUND FLOOR PLAN
Drawing
Not downloaded · Council link
PROPOSED SECTION & ELEVATION BB
Drawing
Not downloaded · Council link
PROPOSED SECTION AA
Drawing
Not downloaded · Council link
PUBLIC NOTICES
BackGround Papers
Not downloaded · Council link
SA - 8022 NOISE IMPACT ASSESSMENT
Revised Drawing
Not downloaded · Council link
SAMSUNG AIR CONDITIONING AR12TXFYAWKNEU CEBU WALL HEAT PUMP
BackGround Papers
Not downloaded · Council link
SITE NOTICE (STANDARD ARTICLE 8)
Correspondence
Not downloaded · Council link
SUPERSEDED 010-A-16-01-A1 -A
Revised Drawing
Not downloaded · Council link