← Back to Tower Hamlets
Status
Registered
Received
n/a
New dwellings
n/a
What you can do
Take Action
Make your voice heard. Authorities need to hear from people who support new homes.
Full Proposal
Part demolition of existing building structure, replacement of building façade, extension at roof level, provision of external terraces and internal changes to enable deep retrofit and refurbishment of the existing office building. Works to provide additional floorspace, with office (Use Class E(g)) floorspace on upper floors and flexible commercial, business and service (Use Class E) and Sui Generis (drinking establishment with expanded food offer; and leisure games venue with associated bar and food offer) floorspace on lower floors. Ancillary works to include replacement plant, reconfiguration of existing servicing and parking space, landscaping, interface works with existing public realm and associated works
Documents
AIR QUALITY ASSESSMENT
Report
Application Form
Application Form
CIRCULAR ECONOMY STATEMENT - PART 2
Report
CIRCULAR ECONOMY STATEMENT - PART 3
Report
CIRCULAR ECONOMY STATEMENT - PART 4
Report
CONSTRUCTION ENVIRONMENTAL LOGISTICS MANAGEMENT PLAN
Report
COVERING LETTER DATED: 21 JAN 26
Correspondence
DELIVERY AND SERVICING MANAGEMENT PLAN
Report
Drawing/Document Issue Register
Drawing/Document Issue Register
DUST MANAGEMENT PLAN
Report
ECOLOGICAL APPRAISAL AND BIODIVERSITY NET GAIN STATEMENT
Report
ENERGY ASSESSMENT AND OVERHEATING MITIGATION
Report
EXISTING GA ELEVATION EAST
Current Plan
EXISTING GA ELEVATION NORTH
Current Plan
EXISTING GA ELEVATION SOUTH
Current Plan
EXISTING GA ELEVATION WEST
Current Plan
EXISTING GA PLAN GROUND FLOOR
Current Plan
EXISTING GA PLAN L01
Current Plan
EXISTING GA PLAN L02
Current Plan
EXISTING GA PLAN L03
Current Plan
EXISTING GA PLAN L04
Current Plan
EXISTING GA PLAN L05
Current Plan
EXISTING GA PLAN L06
Current Plan
EXISTING GA PLAN L07
Current Plan
EXISTING GA PLAN L08
Current Plan
EXISTING GA PLAN L09
Current Plan
EXISTING GA PLAN L10
Current Plan
EXISTING GA PLAN L11
Current Plan
EXISTING GA PLAN L12
Current Plan
EXISTING GA PLAN LOWER GROUND FLOOR
Current Plan
EXISTING GA PLAN MEZZANINE
Current Plan
EXISTING GA ROOF PLAN
Current Plan
EXISTING GA SECTION AA
Current Plan
EXISTING GA SECTION BB
Current Plan
EXTERNAL CONSULTATION CHECKLIST FOR LPAS
Correspondence
Flood Risk Assessment
Flood Risk Assessment
FOUL SEWAGE AND UTILITIES ASSESSMENT - PART 1
Report
FOUL SEWAGE AND UTILITIES ASSESSMENT - PART 2
Report
GA ELEVATION EAST - DEMOLITION
Current Plan
GA ELEVATION NORTH - DEMOLITION
Current Plan
GA ELEVATION SOUTH - DEMOLITION
Current Plan
GA ELEVATION WEST - DEMOLITION
Current Plan
GA PLAN GROUND FLOOR - DEMOLITION
Current Plan
GA PLAN L01 - DEMOLITION
Current Plan
GA PLAN L02 - DEMOLITION
Current Plan
GA PLAN L03 - DEMOLITION
Current Plan
GA PLAN L04 - DEMOLITION
Current Plan
GA PLAN L05 - DEMOLITION
Current Plan
GA PLAN L06 - DEMOLITION
Current Plan
GA PLAN L07 - DEMOLITION
Current Plan
GA PLAN L08 - DEMOLITION
Current Plan
GA PLAN L09 - DEMOLITION
Current Plan
GA PLAN L10 - DEMOLITION
Current Plan
GA PLAN L11 - DEMOLITION
Current Plan
GA PLAN L12 - DEMOLITION
Current Plan
GA PLAN LOWER GROUND FLOOR - DEMOLITION
Current Plan
GA PLAN MEZZANINE - DEMOLITION
Current Plan
GA ROOF PLAN - DEMOLITION
Current Plan
GA SECTION AA - DEMOLITION
Current Plan
GA SECTION BB - DEMOLITION
Current Plan
GREEN ROOF GA L14
Current Plan
HERITAGE TOWNSCAPE VISUAL IMPACT ASSESSMENT - PART 1
Report
HERITAGE TOWNSCAPE VISUAL IMPACT ASSESSMENT - PART 2
Report
LANDSCAPE TERRACE GA L02
Current Plan
LANDSCAPE TERRACE GA L03
Current Plan
LANDSCAPE TERRACE GA L05
Current Plan
LANDSCAPE TERRACE GA L08
Current Plan
LANDSCAPE TERRACE GA L09
Current Plan
LANDSCAPE TERRACE GA L11
Current Plan
LANDSCAPE TERRACE GA L12
Current Plan
LBTH BIODIVERSITY NET GAIN CHECKLIST
Correspondence
PART 1
Design & Access Statement
PART 10
Design & Access Statement
PART 2
Design & Access Statement
PART 3
Design & Access Statement
PART 4
Design & Access Statement
PART 5
Design & Access Statement
PART 6
Design & Access Statement
PART 7
Design & Access Statement
PART 8
Design & Access Statement
PART 9
Design & Access Statement
Planning Statement
Planning Statement
PROPOSED BAY STUDY - TYPICAL OFFICE FLOOR
Current Plan
PROPOSED GA ELEVATION EAST
Current Plan
PROPOSED GA ELEVATION NORTH
Current Plan
PROPOSED GA ELEVATION SOUTH
Current Plan
PROPOSED GA ELEVATION WEST
Current Plan
PROPOSED GA PLAN GROUND FLOOR
Current Plan
PROPOSED GA PLAN L01
Current Plan
PROPOSED GA PLAN L02
Current Plan
PROPOSED GA PLAN L03
Current Plan
PROPOSED GA PLAN L04
Current Plan
PROPOSED GA PLAN L05
Current Plan
PROPOSED GA PLAN L06
Current Plan
PROPOSED GA PLAN L07
Current Plan
PROPOSED GA PLAN L08
Current Plan
PROPOSED GA PLAN L09
Current Plan
PROPOSED GA PLAN L10
Current Plan
PROPOSED GA PLAN L11
Current Plan
PROPOSED GA PLAN L12
Current Plan
PROPOSED GA PLAN L13
Current Plan
PROPOSED GA PLAN L14
Current Plan
PROPOSED GA PLAN LOWER GROUND FLOOR
Current Plan
PROPOSED GA PLAN MEZZANINE
Current Plan
PROPOSED GA ROOF PLAN
Current Plan
PROPOSED GA SECTION AA
Current Plan
PROPOSED GA SECTION BB
Current Plan
RETAIL FRONTAGE
Current Plan
STATEMENT OF COMMUNITY INVOLVEMENT - PART 1
Report
STATEMENT OF COMMUNITY INVOLVEMENT - PART 2
Report
STATUTORY BIODIVERSITY METRIC
Correspondence
SURFACE WATER DRAINAGE STRATEGY
Report
SUSTAINABILITY STATEMENT
Report
Transport Statement
Transport Statement
WHOLE LIFE CARBON ASSESSMENT
Report
WIND MICROCLIMATE STUDY
Report