Construction, operation, maintenance, and decommissioning of aground-mounted solar farm with a maximum grid export capacity of up to 13.5MW complete with landscaping, associated infrastructure, and access provision
Search planning applications in plain English
Describe what you're looking for and we'll find matching applications across hundreds of councils.
50 results found.
Instal 11 solar PV panels on flat roof.
Installation of the buffer vessels, air source heat pumps; installation of fence to north elevation
Installation of 2no Air Source Heat pumps on the roof, associated steel support deck, pipework and electrical containment from the heat pumps along the roof and down the side of the building
Installation of 5no. solar panels to the front roof slope and 19no. solar panels to the rear roofslope.
Ground-mounted Solar PV installation and rear patio works at Great Manson Hall.
Replacement of exiting roofing sheets and the addition of a photovoltaic array.
Installation of ground mounted solar panel array, cabling and associated works.
Adjoining Authority Consultation - Eastbourne Borough Council (260234) - Application to determine if prior approval is required for a proposed: Installation of a solar canopy on non-domestic, off-street parking The Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended)Schedule 2, Part 14, Class OA
Installation of roof mounted photovoltaic 222 panels (Class J, 56 days Prior Approval Process)
application under The Town and Country Planning (General Permitted Development) (England) Order 2015 - Part 15 to install a Ground Mounted Electricity Substation at Land and buildings at Highdell Barns, Warnford, Southampton, SO32 3LJ
Application for prior approval for the installation of Solar Photovoltaics (PV) equipment on the roof of non-domestic building.
The installation of one multi-split wall-mounted heat pump unit to the side elevation at 87 Taunton Road SE12.
Application to determine if prior approval is required for the installation of solar PVs at
Application to determine if prior approval is required for the installation of solar PVs at
Application to determine if prior approval is required for the installation of rooftop solar panels on a flat roof of the Captain Sir Tom Moore Building at
Installation of solar panels, on flat roof x 9 and side roof x 7, of three storey dwellinghouse with panels set back from front elevation (Class J, Prior Approval Process)
Alterations and refurbishment of existing third floor flat. Installation of replacement windows to front and rear elevations and installation of air source heat pump on roof.
Proposed alterations to door and new window to the rear or the property, new ASHP to the front of the property with screening and internal alterations.
Installation of solar PV panels on garage roof and ASHP on rear garage wall.
The installation of 764No. roof mounted solar PV panels, removing part of the exisiting solar PV system (100kWp) it will result in total installed capacity of 604.44kWp
Installation of solar panels.
Refurbishment of existing cafe, creating a doorway opening. Installing a cold store within the cottage. Refurbishment of the seating area. Installation of a freestanding outdoor glazed structure. Installation of improved ventilation, AC and condensing units. Installation of 58 PV panels upon biomass shed outbuilding. (Amended plans and description 19.02.26)
Application for a Lawful Development Certificate (Existing) submitted under Section 191 of the Town & Country Planning Act 1990 (as amended) for the installation of solar panels on the roofs of Stillness Junior School, Brockley Rise SE23.
Application for a Lawful Development Certificate (Existing) submitted under Section 191 of the Town & Country Planning Act 1990 (as amended) for the installation of solar panels on the roofs of Stillness Infant School, Brockley Rise SE23.
Installation of solar PV panels to one roof.
Installation of solar PV panels to the roof a shown in the drawings.
Erection of a 2.3m x 3.6m garden shed. Erection of an (up to) 12m long garden solar array (panel length of approx. 1.9m, mounted at 30 degrees to the horizontal) plus up to a further 2 panels on the shed roof.
Installation of EV charging point and battery energy storage system within the curtilage of Heath Farmhouse.
Installation of 12no. solar panels.
Installation of a 15-panel solar photovoltaic (PV) system to the front-facing roof elevation.
Installation of 2 no. air source heat pumps and repair of flat roof.
Installation of 2 no. air source heat pumps and repair of flat roof.
Installation of PV solar panels on the flat roof area of the existing house.
Installation of solar PV panels on existing garage and garden room roofs.
Installation of an external air source heat pump (ASHP) unit and roof-mounted photovoltaic (PV) solar panels.
Adjoining Authority Consultation - Winchester City Council (26/00707/FUL) - Construction, operation, maintenance, and decommissioning of a ground mounted solar farm with a maximum grid export capacity of up to 5.4 MW complete with landscaping, associated infrastructure, and access provision.
Installation of photovoltaic panels (PV) on the roof of the Sports Hall
Installation of 14 solar panels on detached garage roof to the west of the piggery barn
Install 9 solar panels on our garage roof for the purpose of generating electricity for houshold use, running airsource heat pump and exporting back to grid when in excess. Panels would be sited on existing flat garage roof and mostly concealed by the front parapit. Airsource heat pump to be sited on behind garage.
Installation of 10 roof-mounted solar PV panels on rear and northwest roof slopes of existing dwelling, with internal battery and inverter system, and bird protection mesh. The system has been sensitively designed to minimise visual impact and preserve the character of the New Town Conservation Area, with all panels flush-mounted and positioned to avoid street-facing elevations. No structural alterations or demolition involved.
We are proposing to install a rooftop solar array which will equate to 44.1kWp on a flat roof.
To install PV panels to both west and east wings to the property. Panels will be fitted within 200mm above the existing roof-line of the flat roofs.
Installation of 25no. Solar panels to the flat roof at the west end of the Daubeny Building.
Installation of photovoltaic (PV) panels to roof and 7 x floor-mounted air source heat pumps (ASHP) to front and rear of block of flats.
Installation of photovoltaic (PV) panels to block of flats Like-for-like replacement of the roofs, windows, and doors to a block of flats
Installation of 7 solar panels to dwellinghouse
Installation of 9 solar panels pitched at 12 degrees and rising up 24cms from the garage flat roof. All ancillary equipment will be located within the garage. Installation of a wooden screen along the side of the garage roof to a height as to hide the panels from view (greater than 24cms above the roof line).
Prior notification for installation of solar panels on existing flat roof. Panels will be hidden by parapet upstand guarding that runs around the building perimeter
Removal of gas fired boilers and installation of air source heat pumps and associated pipework on the roof with acoustic screening in the ground service yard and flat roof to the rear of the building. Amendment to the location of the pedestrian gates for fire escape. For-like replacement of existing pool curtain walling and rooflights.